Repair work on the bridge commenced in March 2006. Slightly deformed sections were repaired, while severely deformed sections were replaced with a new bridge segment measuring 20 x 31 m.
>> Fig. 1 The Wiehl Valley bridge under repair
>> Loss ticker
>> Wiehl Valley motorway bridge
>> Topics for negotiation: Bridge repair and refurbishment
>> Legal aspects: Liability and cover
>> Conclusion
>> Schadenspiegel 3/2006